Rockwell-automation 294E ArmorStart LT EtherNet/IP Version - User Manu Manuel d'utilisateur Page 45

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 252
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 44
Rockwell Automation Publication 290E-UM001B-EN-P - June 2012 45
Installation and Wiring Chapter 2
Figure 21 - ArmorStart LT Power and Control Terminals
When internal power supply option is selected, no connection is made here.
Available only with Bulletin 294E.
L2
L1
T1
L3
T2
T3
A2
A3
A1
PE
B1 B2
Wire Strip Length
0.35 ± 0.01 in.
(9 ± 0.2 mm)
Table 7 - Power, Control, and Ground Terminal Designations
Terminal Designations Wires/Connections Description
A1 2 Switched 24V DC Control Power (+)
A2 2 Control Power Common (–)
A3 2 Unswitched 24V DC Control Power (+)
PE 2 Ground
L1 2 Line Power – Phase A
L2 2 Line Power – Phase B
L3 2 Line Power – Phase C
T1 1 Motor Connection – Phase A
T2 1 Motor Connection – Phase B
T3 1 Motor Connection – Phase C
B1 1 Source Brake Connection – B1
B2 1 Source Brake Connection – B2
Vue de la page 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 251 252

Commentaires sur ces manuels

Pas de commentaire